LP434458-8
2H post baseline measurement
Active
Basic Part Properties
- Part Name
- 2H post baseline measurement
- Part Display Name
- 2H post baseline measurement
- Part Type
- Challenge (Describes a "challenge" (loading or tolerance) test)
- Created On
- 2023-01-09
- Construct for LOINC Short Name
- 2H bs meas
LOINC Terminology Service (API) using HL7® FHIR® Get Info
Requests to this service require a free LOINC username and password. Below is a sample of the possible capabilities. See the LOINC Terminology Service documentation for more information.
Language Variants Get Info
| Tag | Language | Translation |
|---|---|---|
| es-ES | Spanish (Spain) | Medición posterior a las 2h de la basal |
| zh-CN | Chinese (China) | 在基线测定之后2小时 Synonyms: 2小时(2H、 |
| fr-FR | French (France) | T02h après la mesure du taux de base |
| nl-NL | Dutch (Netherlands) | 2 uur na bepalen van uitgangswaarde Synonyms: 2 uur na baseline-bepaling |
| it-IT | Italian (Italy) | 2h post misurazione baseline |
| pl-PL | Polish (Poland) | 2h po pomiarze wyjściowym Synonyms: 2 godziny po pierwszym pomiarze |
| el-GR | Greek (Greece) | Μέτρηση 2 ώρες μετά τη μέτρηση αναφοράς Synonyms: Μέτρηση 2 ώρες μετά τη μέτρηση αναφοράς |
LOINC Copyright
Copyright © Regenstrief Institute, Inc. All Rights Reserved. To the extent included herein, the LOINC table and LOINC codes are copyright © Regenstrief Institute, Inc. and the Logical Observation Identifiers Names and Codes (LOINC) Committee. See https://